ROADS

M1 to Raymond Terrace & Hexham Straight Widening

PROJECT SUMMARY LENGTH 15 kms & 6 kms CIVILS 11 x bridges, New Motorway & Road Widening UTILITY TREATMENTS MAIN WORKS circa 550 relocations ENABLING WORKS tbc UTILITY AUTHORITIES Ausgrid & TransgridHunter WaterJemena, AGLTelstra, Optus, NBN, TPGCouncilRMS KEY UTILITIES Potable Water: 1200mm diameterGas: AGL HP 7,000kPaElectrical: 33kV to 330kV transmissionComms: incl. Interstate fibre AT A …

M1 to Raymond Terrace & Hexham Straight Widening Read More »

Coffs Harbour Bypass

PROJECT SUMMARY LENGTH 14 kms CIVILS 3 new Tunnels & 3 new Interchanges UTILITY TREATMENTS MAIN WORKS circa 500 relocations ENABLING WORKS tbc UTILITY AUTHORITIES Essential EnergyCoffs City CouncilTransgridTelstra, Optus, NBN, TPGRMS KEY UTILITIES Potable Water: 600mm diameterElectrical: incl. 66kV Transmission & SubstationsComms: incl. 144 pair fibres & 24w Brisbane to Sydney Fibre AT A …

Coffs Harbour Bypass Read More »

Sydney Gateway

PROJECT SUMMARY LENGTH 5.1 kms FEATURES 11 Bridges LINKS Intl & Dom Terminals  UTILITY TREATMENTS MAIN WORKS circa 100 relocations UTILITY AUTHORITIES AusgridSydney WaterViva Energy, CaltexJemena, QenosTelstra, Optus, NBN, TPGARTC & Sydney AirportSydney DesalinationCouncil & RMS KEY UTILITIES Potable Water: 350mm diameterFuel: Caltex 3,200- 10,880kPaGas: Jemena Sydney Primary Main 3,500kPaElectrical: incl. 33kV Transmission & SubstationsComms: …

Sydney Gateway Read More »

WestConnex 3B – Rozelle Interchange

PROJECT SUMMARY LENGTH n/a KEY FEATURES Tunnel Interchange LINKS M4 & M5 UTILITY TREATMENTS MAIN WORKS circa 400 relocations UTILITY AUTHORITIES Ausgrid & TransgridSydney WaterJemena & AGLTelstra, Optus, NBN, TPGSydney TrainsCouncilRMS KEY UTILITIES Potable Water: 500mm diameterWastewater: 1600mmx1200mmGas: Jemena 1,050kPa High PressureElectrical: 33kV to 132kV Transmission & SubstationsComms: incl. 24w Brisbane to Sydney FibreTrains: Switching …

WestConnex 3B – Rozelle Interchange Read More »

Princes Hwy – Jervis Bay Rd Int. Upgrade

PROJECT SUMMARY LENGTH 2 kms Civils Overpass and Int Upgrades Road widening from 2 lanes to 4 lanes UTILITY TREATMENTS MAIN WORKS tbc  ENABLING WORKS tbc UTILITY AUTHORITIES Endeavour EnergyTelstraOptusShoalhaven WaterCouncil & RMS KEY UTILITIES Potable Water: 300/375mm diameterElectrical: incl. 11kV Comms: multiple fibresDrainage: Box Culverts AT A GLANCE Client: TfNSWProject Value: tbcAUS Start: Nov 2021AUS …

Princes Hwy – Jervis Bay Rd Int. Upgrade Read More »

Easing Sydney’s Congestion & Pinchpoints Program

PROJECT SUMMARY LENGTH n/a Jobs 6 x Projects  Civils Kerb Adjustments & Local Widening UTILITY TREATMENTS MAIN WORKS circa 80 relocations UTILITY AUTHORITIES Ausgrid & Endeavour EnergySydney WaterJemenaTelstra, Optus, NBN, TPGRMS & Council KEY UTILITIES Potable Water: 350mm diameterElectrical: incl. 11kV High VoltageComms: incl. 720 pair fibresGas: 1,050kPa High Pressure AT A GLANCE Client: Transport …

Easing Sydney’s Congestion & Pinchpoints Program Read More »

Nowra Bridge

PROJECT SUMMARY LENGTH 2.5 kms BRIDGE Incremental Launch Civils 3xIntersections, Bridge UTILITY TREATMENTS MAIN WORKS circa 900 relocations UTILITY AUTHORITIES AusgridSydney WaterJemenaTelstra, Optus, NBN, TPGRMS & Council KEY UTILITIES Potable Water: 350mm diameterElectrical: incl. 33kV TransmissionComms: incl. 720 pair fibresGas: HP 1,050kPa High Pressure AT A GLANCE Client: Transport for NSW (TfNSW)Project Value: $342mAUS Start: …

Nowra Bridge Read More »

KGRs2A & Waratah St – Princes Highway Int Upgrade

PROJECT SUMMARY LENGTH Lorem ipsum dolor  STATIONS Lorem ipsum dolor  TRAMS Lorem ipsum dolor  UTILITY TREATMENTS MAIN WORKS Lorem ipsum dolor  ENABLING WORKS Lorem ipsum dolor  UTILITY AUTHORITIES Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. KEY UTILITIES Lorem ipsum dolor sit amet, consectetur adipiscing …

KGRs2A & Waratah St – Princes Highway Int Upgrade Read More »

Horsley Drive

PROJECT SUMMARY LENGTH 3 kms CIVILS Road Widening & 2 Water Crossings UTILITY TREATMENTS MAIN WORKS tbc UTILITY AUTHORITIES Endeavour EnergySydney WaterJemenaTelstra, Optus, NBN, TPGRMSCouncil KEY UTILITIES Potable Water: 450mm diameterWater NSW CanalElectrical: incl. 33kV TransmissionComms: incl. 720 pair fibresGas: Jemena Eastern Gas Pipeline 14,890kPa & Trunk Main 7,000kPa AT A GLANCE Client: Transport for …

Horsley Drive Read More »

Scroll to Top