PROJECT SUMMARY
LENGTH
n/a
Jobs
6 x Projects
Civils
Kerb Adjustments & Local Widening
UTILITY TREATMENTS
MAIN WORKS
circa 80 relocations
UTILITY AUTHORITIES
Ausgrid & Endeavour Energy
Sydney Water
Jemena
Telstra, Optus, NBN, TPG
RMS & Council
KEY UTILITIES
Potable Water: 350mm diameter
Electrical: incl. 11kV High Voltage
Comms: incl. 720 pair fibres
Gas: 1,050kPa High Pressure
AT A GLANCE
Client: Transport for NSW (TfNSW)
Project Value: $30m est.
AUS Start: Jun 2020
AUS Finish: Feb 2021
AUS Role: Utilities Management
AUS Team: Utilities Lead, 2 x Utilities PM’s & Utilities GIS
Works: 80 Utility Relocations
AUS ROLE
AUS was engaged by ESC’s FAD Program, tasked with getting 6 historic roads projects to market in 6 months from appointment. This involved taking previous Concept Designs ranging in completeness (50%-100%) and planning and scheduling their most efficient utility design and relocation. We proposed early works relocations that enabled the projects to start, and which benefited the eventual construction of the overall works. AUS undertook the Contestable utility designs (Water, Electrical and Street Lighting) and obtained certification from the relevant utility providers, and for the non-Contestable utilities (Gas & Comms) obtained designs and Letters of Offer/Scopes of Works ready for the Contractor to simply make payment on their appointment to get the works undertaken (D&C). This was done whilst the TfNSW project team & Technical Advisors (TA) who had 2 projects each (Jacobs, Aecom & Turnbull Engineering) developed the remaining Detailed Design (roadworks, structures, ITS, etc.)
Description of Service Scope:
- Utilities Project Management & Coordination
- Utility Clash Assessment (Registers & Drawings)
- Utility Digital Engineering GIS’s
- Preparing the Utilities Survey Scope (PS321) and management through G71
- Utility Constructability & Staging advice
- Utilities Designs – Concept & Detailed Design (Contestable – Water & Electrical) & Option Papers, including obtaining Scope of Works and Letters of Offer
- Preparation of Utility Tender Estimates and Utility Construction Programs
- Interdisciplinary designs reviews 80 & 100%
- Preparing and updating the Utilities Management Plan
- Utilities Transaction, Contract & Delivery advice
- Utility Specifications for inclusion in Tender/Contract
- Property acquisition and Easements planning & advice
- Construction Support