Transport Asset Revitalisation Program (TARP)

PROJECT SUMMARY

SCOPE
To advise TfNSW on the utility works required to redevelop multiple sites. 

DEVELOPMENT TYPE

Mixed Use - Residential & Commercial
Included Schools and Health Facilities

UTILITY AUTHORITIES

Ausgrid
Endeavour Energy
Sydney Water
Jemena, Caltex, Viva
Telstra, Optus, NBN, TPG
Sydney Trains
RMS
Councils

KEY UTILITIES

Potable Water: incl. 1200mm diameter
Wastewater: 750 mm diameter
Fuel: Viva
Gas: Jemena HP 1,050kPa High Pressure
Electrical: incl. 132, 66 & 33kV Transmission & exiting & new Substations
Comms: incl. 720 pair fibres, 1000pr copper

AT A GLANCE

Client: Transport for NSW 
Project Value: Confidential
AUS Start: May 2019
AUS Finish: Jun 2020

AUS ROLE

AUS was engaged by TfNSW as a Technical Specialist (Utilities) to assist them in assessing the utility scope associated with redeveloping a number of sites. The sites were proposed to be commercial, residential and mixed use.

Description of Service Scope:

  • Undertook Power Studies and advised on loads, points of connection and sizing of sub-stations
  • Reviewed and advised on easement & RoW requirements
  • Undertook Water & Foul Water Studies and advised on loads, points of connection & supply/discharge
  • We reviewed previous work and identified opportunities for improvement of the integrated transport planning outcomes within the development of a residual property and divestment strategy;
  • Provided technical advice on the interface with other Infrastructure works;
  • Prepared technical implementation reports/papers that documented the approach, process and outcomes of the technical work, suitable to support the definition design and final business case;
  • Prepared presentation documents summarising elements of the residual land and divestment strategy appropriate to the scope of work to assist the finalisation of the final business case for investment decision;
  • Provided high level assumptions for services for each product typology (residential, commercial, retail, childcare and other);
  • Provided high level commentary on services infrastructure existing capacity and or required upgrades; and
  • Provided high level forecast for Authority contributions